Products

Medium-Voltage Liquid-Filled Transformers

High-performance pad-mounted and pole-mounted transformers built to dependable U.S. standards and delivered on your schedule.

Pad-mounted transformer installed on site
Pad-mounted transformer front view
Pad-mounted transformer side view
Transformer installed outdoors
2,000 kVA pad-mounted transformer
Pad-mounted and pole-mounted transformers outside the factory
Pole-mounted transformers ready for delivery
Interior components of a liquid-filled transformer
Transformers ready inside the factory
Transformer manufacturing on the factory floor
Transformer materials prepared for manufacturing

Specifications

  • Configurations: Pad-mounted or pole-mounted
  • Capacity Range: Up to 2,500 kVA
  • Insulation: Liquid-filled

Standards

  • ANSI/IEEE (C57 series)
  • UL listed

Applications

  • Utilities
  • Commercial buildings
  • Data centers
  • Renewable energy

Key Benefits

  • Fully assembled
  • Over 40 years of manufacturing experience
  • Tested by U.S. engineers
  • Four-month delivery
  • Custom projects available
Inside factory
Manufacturing
Manufacturing 2

Why this product

Elite lead times without the usual logistics burden

Ready for the Grid

Units are fully UL listed and strictly compliant with ANSI/IEEE C57 standards, ensuring seamless approval and inspection for municipal utilities and domestic projects.

Elite Lead Times (4 Months)

While the industry averages 30 to 45 weeks for a transformer, our streamlined coordination with the manufacturer gets fully assembled units delivered directly to your site in as little as four months.

Handled to Your Door

Every detail, from factory fabrication and overseas shipping to pricing and customs, is fully managed by the manufacturer. Kore Power Solutions steps in the moment the unit arrives at your location to ensure a flawless handoff.